|
Post by brygun on Dec 1, 2019 19:11:06 GMT -6
As far as I know if I complete the months for a design to be completed but not built I can't use that design as a cost savings for redesign.
For instance design CA Wonderwaffen for 4,000 and 4 months.
During those 4 months the current war ends and the budget for building drops horribly. Many underway constructions get halted and slowly completed..
So the ship's construction doesn't start.
Another 6 months later the budget is now available.
Its now 10 months since it was designed.
I would like to use the Wonderwaffen as a basis for an updated design. Like the 10% to XX% cost variation for different guns, engines and so forth.
|
|