akd
Full Member
Posts: 126
|
Post by akd on Mar 4, 2024 15:20:54 GMT -6
1. When asking to expand a base, I'm getting a confirmation message that does not match the current base level. Possibly this is just a typo and it should say "by 50" instead of "to 50." As you can see, the base in question is already at 110. 2. After confirming that base expansion, the current base size plus (B) is shown in the Value column alongside the current base capacity. Seems to me that the "110" in the capacity column should just become "110 (B)". (edit: started displaying properly after I reloaded my save.)
|
|